• DE
  • EN
RIOCOM RIOCOM
  • Home
  • About us
  • Competencies
    • River renaturation
    • Risk management
    • Flood protection
    • Disaster Reduction
    • Simulation
  • Projects
  • Blog
  • Team
  • Contact

Blog

12.04201912. April 2019
Water flows again in the “Langen Luss”

Water flows again in the “Langen Luss”

An almost 2 kilometers long branch of the March - the “Lange Luss” - is again constantly flowing through.

Read more
12.04201912. April 2019
Inspection of the Mur…

Inspection of the Mur…

... during the preparation of the hazard zone plan

Read more
12.03201912. August 2019
The Styrian population is better prepared for a flood!

The Styrian population is better prepared for a flood!

The awareness campaign „self protection flood“ in Styria has been very successful so far.

Read more
01.0220194. February 2019
Special disaster control plan – Thaya flood

Special disaster control plan – Thaya flood

Starting phase for 24 communities along the upstream and middle section of River Thaya

Read more
13.12201813. December 2018
Merry Christmas & A Happy New Year

Merry Christmas & A Happy New Year

The Team of RIOCOM wishes you happy and peaceful holidays & much joy, health and prosperity in 2019!

Read more
18.10201810. December 2018
Finished! Water body maintenance concept for the river Krems

Finished! Water body maintenance concept for the river Krems

RIOCOM hands over the products of the pilot study

Read more
  • 1
  • …
  • 5
  • 6
  • 7
  • 8
  • 9
  • …
  • 16

sidbar 1

RIOCOM RIOCOM
  • Home
  • Contact
  • Imprint