We manage the construction work in the project “Thaya 2020”

Since the beginning of August 2018, the project “Thaya 2020 – Renaturation and Meander Integration on the Thaya” is under construction. Two separate meanders are reintegrated to the Thaya. The goal of the measures is the improvement of water and floodplain ecology. Also, this beautiful river is given back something of its original character, habitat for the flora and fauna is created!

Our two employees Johannes Roither and Arnold Putz make sure with their commitment that the construction project succeeds. As Local Construction Supervision (ÖBA), they represent the interests of the client, viadonau, on site. In their function as construction site coordination, they ensure the safety of the workers on the construction site. A particularly interesting challenge is the constellation as a bilateral project between Austria and the Czech Republic.

Further informations:
https://noe.orf.at/news/stories/2933512/
http://www.viadonau.org/unternehmen/projektdatenbank/aktiv/thaya-2020/