{"id":4076,"date":"2018-09-07T10:25:29","date_gmt":"2018-09-07T08:25:29","guid":{"rendered":"https:\/\/riocom.at\/?p=4076"},"modified":"2018-09-20T17:06:52","modified_gmt":"2018-09-20T15:06:52","slug":"riocom-lands-twice-on-the-danube","status":"publish","type":"post","link":"https:\/\/riocom.at\/en\/riocom-lands-twice-on-the-danube\/","title":{"rendered":"RIOCOM lands twice on the Danube"},"content":{"rendered":"<style type=\"text\/css\"><\/style><h3><a href=\"https:\/\/riocom.at\/wp-content\/uploads\/18_06_Blick_SpittelauerArm_01.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-post-thumbnail wp-image-4071\" src=\"https:\/\/riocom.at\/wp-content\/uploads\/18_06_Blick_SpittelauerArm_01-820x490.jpg\" alt=\"\" width=\"820\" height=\"490\" \/><\/a><\/h3>\n<h3>We are allowed to prove our competence on the Danube twice<\/h3>\n<p>We got the good news to plan the two big re-connections of side arms at the river Danube.<br \/>\nIn the first project <strong>&#8220;Re-connection of side arms at Spittelauer Arm&#8221;<\/strong>, a side arm with a length of 4 km is to be connected dynamically again and made uniform for fish.<br \/>\nThe second project <strong>&#8220;Re-connection of side arms and river bank renaturation at Haslau-Regelsbrunn&#8221;<\/strong> is even more complex: Besides a river bank renaturation of 3,9 km length and a re-connection of side arms of 10 km length, also the different interests along the river have to be considered to create an integral project.<\/p>\n<p>In order to master this task, RIOCOM works together with the following specialists:<\/p>\n<ul>\n<li><a href=\"http:\/\/www.a-v-l.at\/\">AVL Arge Vegetations\u00f6kologie und Landschaftsplanung &#8211; Technisches B\u00fcro<\/a> (both projekts)<\/li>\n<li><a href=\"http:\/\/www.bgg.at\/\">BGG Consult Dr. Peter Waibel ZT-GmbH<\/a> (Haslau-Regelsbrunn)<\/li>\n<li><a href=\"http:\/\/www.woschitzgroup.com\/die-gruppe\/woschitz-engineering\/\">Woschitz Engineering ZT GmbH<\/a> (Haslau-Regelsbrunn)<\/li>\n<\/ul>\n<p>Client: <a href=\"http:\/\/www.viadonau.org\/home\/\">via donau &#8211; \u00d6sterreichische Wasserstra\u00dfen-Gesellschaft mbH<\/a><\/p>\n<p>We look forward to the interesting work on the DONAU!<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>RIOCOM is pleased about the commissioning of the planning for the &#8220;River Network and Bank Decline Haslau-Regelsbrunn&#8221; and the &#8220;River Network Spittelauer Arm&#8221;<\/p>\n","protected":false},"author":2,"featured_media":4071,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"class_list":["post-4076","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/riocom.at\/en\/wp-json\/wp\/v2\/posts\/4076","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/riocom.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/riocom.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/riocom.at\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/riocom.at\/en\/wp-json\/wp\/v2\/comments?post=4076"}],"version-history":[{"count":5,"href":"https:\/\/riocom.at\/en\/wp-json\/wp\/v2\/posts\/4076\/revisions"}],"predecessor-version":[{"id":4086,"href":"https:\/\/riocom.at\/en\/wp-json\/wp\/v2\/posts\/4076\/revisions\/4086"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/riocom.at\/en\/wp-json\/wp\/v2\/media\/4071"}],"wp:attachment":[{"href":"https:\/\/riocom.at\/en\/wp-json\/wp\/v2\/media?parent=4076"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/riocom.at\/en\/wp-json\/wp\/v2\/categories?post=4076"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/riocom.at\/en\/wp-json\/wp\/v2\/tags?post=4076"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}